Excavation works
Trenches for utility networks, foundation pits, topsoil stripping and precision digging next to existing utilities.
FIG. 01
We carry out mechanised excavation with our own excavator and crew: trenches for pipes and cables, foundation pits, topsoil stripping and pits for manholes. We work to the setting-out from the design or on site, take care around existing utilities and can also haul the excavated soil away.
01Scope
What the service includes
- 01
Trenches for pipes and cables
- 02
Foundation pits
- 03
Topsoil stripping
- 04
Excavation for manholes and tanks
- 05
Hand digging next to existing utilities
- 06
Trench shoring where required
02Details
Details
When you need mechanised excavation
Excavation is the first stage of almost every utility or building job: water and sewer connections, district heating networks, house foundations, tanks, septic systems or drainage. With an excavator, a trench that would take days by hand is dug in a few hours, with straight walls and a controlled depth.
How we work
- We locate existing utilities — we request the plans from the network owners or probe by hand before the machine goes in.
- We set out and dig to level — following the width and depth in the design, with a fall where needed.
- We shore the trench walls at greater depths or in unstable ground, to keep the crew safe.
- We manage the spoil — stockpiled beside the trench for backfill, or loaded and hauled away.
What we need for a quote
The location, approximate length and depth of the excavation, the type of ground (if known), access for the machine and whether the soil stays on site or has to be removed. A few photos sent on WhatsApp help us estimate quickly.
03Process
How the work runs
Enquiry
Contact us by phone, on WhatsApp (photos welcome) or through the form. We clarify the scope briefly.
Site assessment
We check the site, machine access, ground conditions and existing services.
Written quote
You receive a quote with stages, timelines and price. Work starts under a contract.
Delivery & handover
We carry out the work, reinstate the ground and hand over with a signed acceptance report.
04FAQ
Questions about this service
What needs to be ready before excavation?
Can you dig next to existing cables and pipes?
Quote request
Planning a project? We’ll reply within 24 hours.
Send us the location, a short description and, if possible, a few photos. We’ll come back with questions or a site visit date.