RH Activities

Utility & earthworks contractor · Romania · since 2021

Underground networks and earthworks, built with precision.

We carry out machine excavation, pre-insulated district heating pipework, water and sewer networks and heating installations — with our own crew and machinery, from opening the trench to reinstating the ground.

Excavator next to pipes laid in a trench FIG. 01
Underground networks — excavation and pipe laying
Tax ID
CUI 43945288Registered with the Trade Register (ONRC)
Established
Since 202119 March 2021
Equipment
Own machineryExcavator and site equipment
Quote requests
Reply within 24 hPhone, WhatsApp or email

01At a glance

RH Activities, in brief.

Who we are
RH ACTIVITIES & WORKERS SOLUTIONS SRL (trading as RH Activities) is a Romanian contractor established on 19 March 2021, tax ID (CUI) 43945288.
What we do
Excavation works, district heating pipe installation, heating installations, plumbing installations, welding, water and sewer networks, grading and earthworks, soil and debris haulage.
Where we work
In Romania, travelling to the site. Tell us the location and we will confirm availability straight away.
Who we work for
Homeowners, residents’ associations, property developers, general contractors and network operators — directly or as a specialist subcontractor.
How we work
With our own crew and machinery, under a written quote, a contract and an invoice for every job. Reply within 24 h.
Contact
+40 763 609 683 (phone & WhatsApp)
contact@rhactivities.com

03Method

How we build a district heating network

Pre-insulated pipes are laid on a sand bed at the spacing and depth set out in the design. Joints are welded, sealed with sleeves and tested; the trench is then backfilled in compacted layers, with a warning tape above the route.

  1. 01Reinstatement of the surface layer
  2. 02Backfill, compacted in layers
  3. 03Warning tape
  4. 04Protective sand, min. 100 mm above the pipes
  5. 05Pre-insulated flow (F) and return (R) pipes — steel, PUR foam, HDPE casing
  6. 06Moisture-detection wires
  7. 07Sand bedding, min. 100 mm
District heating pipe installation
Typical cross-section through a district heating trench Two pre-insulated pipes on a sand bed, protective sand, warning tape, compacted backfill and surface reinstatement, with dimension lines. F R H 100 Øe 100 ≥150 B 01 02 03 04 05 06 07 A–A RH-TD-01
Fig. — Typical section A–A through the trenchDimensions in mm · indicative, not to scale

04Process

Four stages, agreed from the outset.

You know from the start what will be done, how long it will take and what it will cost.

01

Enquiry

Contact us by phone, on WhatsApp (photos welcome) or through the form. We clarify the scope briefly.

02

Site assessment

We check the site, machine access, ground conditions and existing services.

03

Written quote

You receive a quote with stages, timelines and price. Work starts under a contract.

04

Delivery & handover

We carry out the work, reinstate the ground and hand over with a signed acceptance report.

05Company

A delivery contractor with its own crew and machinery.

RH Activities has been carrying out groundworks, utility networks and building services since 2021. We work for private clients, residents’ associations, developers and general contractors.

Owning our machinery lets us plan reliably and respond quickly. Every job has a written quote, a contract and an invoice — and ends with the site reinstated.

About the company

Company identification

per ONRC
Legal nameRH ACTIVITIES & WORKERS SOLUTIONS SRL
Tax ID (CUI)43945288
Trade Register no.J2021000395107
EUIDROONRC.J2021000395107
Incorporated19.03.2021

06FAQ

Frequently asked questions

All questions
Is the quote free?
Yes. The initial assessment — by phone or from photos sent on WhatsApp — and the written quote are free of charge. For more complex jobs we arrange a site visit before quoting.
How long does a job take?
It depends on route length, depth, ground conditions and machine access. A trench for a single service connection usually takes one to two days; a longer district heating section can take several weeks. The exact timeline is set out in the quote and the contract.
Do you reinstate the ground afterwards?
Yes. We backfill the trench in compacted layers, level it and return the ground to its original condition. Hard surfaces such as asphalt or paving are stated explicitly in the quote.
Who handles permits and approvals?
The building permit and utility owners’ approvals are normally the responsibility of the client or the designer. We can advise on the documents required, and where the law requires approved documentation, we only work on that basis.

Quote request

Planning a project? We’ll reply within 24 hours.

Send us the location, a short description and, if possible, a few photos. We’ll come back with questions or a site visit date.